
Mobile Command Centre
Titan
Expands from 2.5 m to 6.5 m wide. Operations floor for around 30, own 55 kVA power, Starlink and a 14 m mast.
See Titan

Mobile event infrastructure, Australia-wide
Self-powered, Starlink-connected mobile command centres, stages and hospitality trailers, built to roll in, set up and run your event anywhere in Australia.
Built for events that can't go wrong
Tech Event builds and operates specialist event trucks for organisers who can’t afford things to go wrong. Our trailers arrive up to a week early, deploy hydraulically and run on their own power, internet and climate control, so your crew gets a quiet, cool, connected base in the middle of the loudest, most remote sites.
Our double-storey trailer Skyline is one of a kind in Australia, and Titan is among the largest mobile command centres in the country. If your site has nothing, we bring everything.
The fleet

Mobile Command Centre
Expands from 2.5 m to 6.5 m wide. Operations floor for around 30, own 55 kVA power, Starlink and a 14 m mast.
See Titan

Double-Storey Hospitality Trailer
Rises to two storeys. Executive veranda upstairs, showroom or office downstairs, a networking deck and big screens.
See Skyline

Pop-Out Stage Truck
Sealed pantech with a 1-tonne tailgate loader. Press a button and a steel stage deploys from the side in seconds.
See Encore

Mobile Timing and Race Control Trailer
A full timing and race control system on wheels. Two seasons on Supercars, now available to other categories.
See Chronos

Mobile Gate Office
20-foot container office with a shaded 6 m deck, air-conditioning and Starlink. First on site, last off.
See The Gatekeeper

Better together
Titan's side opens fully and connects to Skyline, so guests and crew walk straight from the operations floor onto the networking deck and up to the hospitality level. An instant event precinct, self-powered and connected.
How they link upRapid-deploy CCTV
Titan carries 16 self-sufficient camera pods on a wireless mesh. A camera network that usually takes two to three weeks to cable up is deployed in about six hours, and watched from inside Titan.
Rapid-deploy CCTV6 hrs
With Titan's wireless camera pods
2–3 wks
To cable a typical site camera network
The team behind Supercars timing
Through MS Timing, we deliver timing for Supercars and race meetings across Australia. Our refrigerated timing trailer, Chronos, carries the servers and race control systems behind Supercars, and it's now available to other race categories too.

Events we suit
Event packages tailored to your site, dates and crew. Request a quote for a fast, itemised price.